A straight zig-zag staircase rising through three levels of a Wandsworth family home. Solid oak treads are paired with a contrasting natural walnut handrail — a deliberate material mix that adds visual interest without breaking the overall warmth of the palette. The extended intermediate landing gives a natural pause point between floors, and motion-activated LED lighting beneath each tread ensures the staircase never needs a switch. The 13.5mm laminated glass balustrade runs the full perimeter of both flights and the landing.
This is a completed project from our portfolio. We can create a similar staircase with your custom specifications. Use our calculator to configure your exact requirements, or contact us for a detailed quote.
A straight zig-zag staircase rising through three levels of a Wandsworth family home. Solid oak treads are paired with a contrasting natural walnut handrail — a deliberate material mix that adds visual interest without breaking the overall warmth of the palette. The extended intermediate landing gives a natural pause point between floors, and motion-activated LED lighting beneath each tread ensures the staircase never needs a switch. The 13.5mm laminated glass balustrade runs the full perimeter of both flights and the landing.
Configure your staircaseUse our calculator to configure your custom staircase
Use our advanced calculator to configure these materials and see your exact price with VAT included.
Most applications receive an instant decision. In some cases, additional documentation may be required, which can take 1–2 business days to process.
We work with solid oak, walnut, ash, and micro-concrete finishes. All materials are sustainably sourced from certified European suppliers.
Typical installation takes 1–3 days depending on the complexity of the staircase design and site conditions.
Yes, all our staircases come with a 10-year structural warranty and 2-year finish warranty.
Absolutely. Every staircase we build is bespoke. Our design team specialises in challenging spaces and unusual configurations.
From initial consultation to installation, the process typically takes 8–12 weeks depending on design complexity and material availability.
Yes, we manage all necessary building regulations compliance and can assist with permit applications where required.